Monday, June 29, 2009

Saturday & Sunday June 27-28

Even after working past 10 pm on Friday, Little Tony and the guys were hard at work by 7 am trying to get everything done so that they could make it to the Able Picnic at Bay Beach. Late on Friday, Little Tony used the heavy equipment to make a firm walking path (seen below) from the gravel road to the snack stand. That area had become very soft and messed up from all of the heavy equipment driving and turning in that area. Shortly after 7 am, Richard had the cement mixer making mortar. Little Tony used the mortar to attach the cap pieces on the short walls in front of the beach area. Once attached, the walls are perfect for sitting on to enjoy the views. Once that project was complete, the rest of the mortar was used to start the cement block retaining wall that is needed for the bocce court. Little Tony got both corners done. After another trip to the shack in Athelstane for more barn boards, Tim trimmed out the bathroom. The closet door will be made another day, as the rain forced him to stop working. (the saws were both set up outside.
Karol left at 12:30 to pick up Annissa from Lake Lundgren Bible Camp, while the guys kept working. She left lunch out for them, which they never even touched. In a race again rain and time, no lunch allowed. During all of this, somehow all of the tools and materials that accumulated in the work zones were cleaned up and put away.
After showers, everyone left for the picnic at about 2:30, feeling very good about how the grounds look. The rain held off in Green Bay for the Able Picnic and everyone had fun. DJ had a little too much fun on the rides, and paid the price afterwards. As a reward for all the hard work done in the past week, the Kelly's, the Piantine's and the Hartley House gang all went to the budget cinema for a movie. (truth be told, Little Tony and Tim struggled to stay awake.)
Sunday morning, Little Tony and Karol worked on the final touch ups before the Cornerstone Church picnic. Little Tony cut some low branches where people will be walking on the new path, and he ribboned-off areas where people shouldn't be walking. Karol worked til 10 cleaning both bathroom floors, putting up shower curtains, installing a toilet tank and toilet paper holder. All the while Tony Sr and Jo were doing final preparations for the picnic. Thankfully, the threatening rain stayed threatening until evening, and the picnic goers had a good time.
Meanwhile, after running Mega, Tim and Little Tony had a missions trip meeting at Living Hope Church for those who will helping at Camp Daniel this summer. Afterwards, Little Tony went to the Mandich's for a visit and to pick up a motor boat that they are letting Camp Daniel use for the summer. At 5:30 it was off to the young adults group at the Falk's home, where Little Tony and Tim shared about Camp Daniel.


Saturday, June 27, 2009

Friday June 26

Well this was the last of the super long days for this project. Everyone was a little low on steam today, but many things did get done. Tim, then Little Tony worked on the recycled drinking fountain (thanx Cornerstone Church!) It was mounted on the exterior of the Craft Cabin between the two bathrooms.
Speaking of bathrooms, the sink is finally done. Tim installed the sink, refitted the drawers (the plumbing took up a bunch of room) and put on the hardware. For the finishing touch, Karol enhanced the stones for that ooh la la "wet look." The shower in this bath gave Tim a run for his money, and thus far the shower is winning. But that part can wait. Tim and Karol ripped the barn boards that will be used as the chair rail. They decided to move the chair rail down about 5 inches so that it doesn't intersect with the stone backsplash. This required a quick repaint job of a 5 inch strip around the bathroom.

In the morning, Karol, Anthony and Big Anthony (DiBiase) went to Karol's dad's cabin to get rocks. He has big granite boulders from digging a basement a few years back. A tractor and some help from Big Anthony got the boulders onto the trailer for a short ride back to Camp Daniel. This rocks were so big and heavy that 6 was about all that was safe to carry on the trailer at once. Two trips were needed in the end. Getting them into place involved the forks being moved close together on the Skidsteer, and, of course, some help from Big Anthony.

Two more pallets of sod down. Yea!! It looks great. Nothing quite like the instant gratification of sod. Now it's water, water, water. With the main projects winding down, we were left with lots of construction mess. Tony Sr, Jo and Chrissy cleaned out the snack stand to get it looking good for the church picnic. The guys hauled away the 2x4s from the concrete forms, wheelbarrels full of sticks and debris from the topsoil, and lots of tools.
During lunch Don (the guy that made the tables for the snack stand, etc) came with tables he just finished for the lakeside patio area. The kids helped Karol out today by testing two 5 gallon buckets full of plastic ducks that were donated for the carnival. They were separated into floaters and sinkers. George and Rudy even caught two bunnies.







Thursday, June 25, 2009

Thursday June 25th

Oh, the power of a fast approaching deadline, to make us work so hard, for so long, and in such heat! Another 12 hour day has come and gone. This morning, Tim, Little Tony, Karol and the guys started the day pouring concrete. They finished the areas started on Tuesday's pour. Below, you can see the finished ramp. After the pour, the massive fire ring was put in place. Tim used the skidsteer to put it in the hole that Little Tony and the guys dug for it.

Once the fire ring was in place, it was time to start the prep work to lay sod by the lake. John went to Lena to get sod and everyone else grabbed a shovel or rake and started leveling the sand. Little Tony and Tim used the dump truck and skidsteer to bring topsoil from the back of the property to the lakefront. The dirt was then leveled out so Tim and Nick could start laying sod.



Looking toward the Bait Shop.




View from the lakefront toward the Craft Cabin.








They laid three pallets of sod, with three more to go tomorrow!






Tuesday, June 23, 2009

Tuesday June 23

This morning Little Tony, Karol and the guys finished all of the prep work for a concrete pour. Just before lunch, Karol, Nick, Anthony and Tommy headed to Athelstane to fill up all of the empty fuel containers and salvage some aged boards from an old shack that we'll take down entirely later this summer. The boards will be used as molding in the "rock" bathroom. Tim and John brought many loads of sand to the pour site using the skidsteer and dump truck, while the forms were being finished and the beds leveled, compacted and wet down. The concrete truck came at about 3 o'clock. As you can see in the pics below, we poured half of the total job, and in sections. The other half will be poured tomorrow, weather permitting.


Afterwards, Karol left for Green Bay to pick up Anthony DiBiase from the airport. (He'll be here till sometime during the 3rd week of camp!) We're all excited to have him here again this summer.
The guys worked some by the lakefront, which ended, refreshingly, in the lake. What a hot hot hot hot day.


Monday, June 22, 2009

Saturday June 20, Sunday June 21

All of the rock is done on the Craft Cabin! It really looks great. The rest of the exterior will be finished in the cedar shakes that have been started on the south side (below). The guys really got a lot done from Friday evening (yes, they worked past dark) til Saturday noon. Eli and Dave left about then. Little Tony continued working Saturday and all day Sunday. He and the guys took down the old entryway to the stairwell that goes into the basement. Plus, they dug out where the new stairwell will be. It will run along the building, instead of going out away at a right angle. You can see to the left of the tarp that they dug down pretty deep.

They also worked on the lakefront. They scooped off the top layers of gravel and saved that for later use, leaving sand and dirt which will be leveled off and laid with sod. Basically the road will no longer go straight towards the lake, but rather turn to meet up with the path that goes behind the snack stand. Also, the fire pit will be placed around the bottom of this picture, almost in the middle of what was road.
They also made these two little walls on the newly poured path. They will act as a formal entrance to the beach. Little Tony and the guys laid concrete block and covered them with the rock and cap stones. It's the perfect height for sitting on and enjoying the view of the lake.






Saturday, June 20, 2009

Friday

Eli and Dave came Thursday night from Black River Falls. They got to work right away on Friday. Dave worked on the electric in the dorms all day and Rick Bub Came over to help him out. They finished up the electric in both dorms and installed temporary lights. Eli worked with the Camp Daniel crew. Below, Little Tony and Tim layed the block for the shed overhang, behind the Craft Cabin. Below, Eli rocked the face of this wall. He mortared the joints as he went along. We had a little on and off rain, hence the tarp. Tony and the guys worked on more retaining wall to define all of the areas. Plus they got all of it backfilled. Ricj Bub brought over his skidsteer for us to use for a week or two! Little Tony put it to use right away and distributed about 15 pallets of rock and retaining wall that was delivered last week for the Illinois work group that will be coming later this summer. Thanks to the sale of the old little red tractor Camp Daniel now has a fund to purchase a skidsteer. There is now $4000 in it! When we get enough we will find one with a bucket, forks, and a snowblower.
The construction went well into the night with the lights coming out and fin ally with everyone pitching in the cultured stone was finished at about 10:15 PM. Chrissy and Karol spent a couple of hours today going over the immense grocery list for camp. It's coming faster than any of us are prepared for!! Little Tony and Papa Tony spent an hour that night finishing up camper and counselor matches. Papa Tony can send out all the acceptance letters he has ben working on this week.

Thursday, June 18, 2009

Thursday

Today, Renee and Bart Lubinski came for a work day. They worked on the exterior of the Craft Cabin. They nailed on tyvek wrap, put up trim and edging, then started putting on the cedar shakes. Little Tony and the guys put the retaining block on the edge of the new path and made a wheelchair ramp to the upper area. This involved a lot of back fill of gravel and sand. Also, Tony started mortaring cement block behind the Craft Cabin where there'll be a shed overhang.
Tim finished prepping the exterior of the Craft Cabin so that work can begin tomorrow mortaring on the rocks. He also prepped the water fountain, and (let's face reality) had some fun on the skidsteer that we're borrowing for the week.
Nancy and Tom List also came out for the workday today. Nancy went to town on priming and painting the 2x4's for the exterior trim. Tom helped Tim and the guys with the block work and back fill. Tonight they're sleeping at Jo and Tony Sr's.
After dinner, Eli and Dave, from Black River Falls, arrived for tomorrow's workday. They'll be sleeping upstairs tonight and tomorrow.
Karol and her sister, Janice, made lunch and dinner for all of the workers. Also, they worked on craft projects for camp, went thru theme night stuff, carnival prizes and camp awards.