Wednesday, October 10, 2012

Fall Projects

October 5th and 6th Workdays.
  Construction began on The Hartley House garage.
                                       Construction will continue Mon and Tues Oct 15 & 16





Richard and Brian helping out.

Split rail fences where added around the campus
as well as restaining of the dorms and garage




The Able Church came to rake leaves and
help dig out for concrete forms.


Thursday, October 4, 2012

October 4, 2012

Last Saturday, we built the retaining wall by the Hartley House.



This Friday and Saturday we have groups coming up to build the garage by the Hartley House.
Also, this Saturday is the Able Church workday!

Friday, September 28, 2012

September 28, 2012


We've been pretty busy lately. Recently, we had our Camp Daniel appreciation picnic. That went very well. There was plenty of good food, and everybody had a good time. Here are some pictures of the bleaches by the fire pit the Chicago Youth Group started.

A dock for the wheelchairs


On Monday and Tuesday we poured cement.

Next Saturday there is a group coming to build a garage here. Down by the Hartley House.

Pouring the sidewalk to get to the men's dorm




We have a work day tomorrow and the Able Church workday October 6th. 

Wednesday, September 5, 2012

What's Going On

A lot has happened since our last blog post.We lost a great friend and brother in Christ. On July 2nd, DJ Brunot went home to be with Jesus.
Although we miss him and are really sad, we rejoice in the fact that he is in a better place with God. Imagine, the first thing you see in your whole life is Jesus. Wow! What an amazing thing!

The camp season is done and over with for the year. It was an amazing year with a lot of volunteers.
We had the biggest camp ever during week two with 150 people! A group of about 50 junior high students from Racine came up for the week to help us out.

This year's theme was "Grow". The verse was Psalm 92:13: "When we are together, God helps us grow." 
We can't do everything by ourselves, but if we do it together, God will help us get through it.

On the week that there was no camp, the Our Lady of Hope group from Chicago came up and helped build some stuff. They built bleachers around the fire pit, a retaining wall by the driveway of Tony and Karol's house. They built other things too. We will have pictures up soon.

Also, the Camp Daniel annual appreciation picnic is this Saturday, September 8th. If you have volunteered, donated something, or helped out in any way, come on down and hang out with us. There will be plenty of food, a corn roast, and a raffle.

Monday, June 25, 2012

The Sign for "The Factory" (Craft Cabin)

New Walkways Behind Women's Dorm

Driveway By Tony Sr. and Grandma Jo

The Women's Dorm

Room in Women's Dorm

Shower in Dorm

Bathroom in Dorm

Floor in Women's Dorm

Pastor Tim Fixing Karol's Golf Cart

Crystal and the Guys Working on the Trailer

Baby MJ

Down By the Lake

Bathroom in "The Factory"

The Raft that Tony, Crystal, and the Guys Built

Wednesday, June 6, 2012

The Mythology of Concrete

 If you are current on contemporary mythology, then you've heard of the Concrete God, aptly named, "Portland".  Many people today feel that this mythological god has already taken over the world.  But here at Camp Daniel, we need lots of concrete for wheelchair accessible sidewalks.  We are fortunate enough to have many wonderful professional tools to make the job easier.  None better than our new addition, "the power screeder".  You can see it in action in the top photo.  In the past screeding, or leveling of concrete, was always done with a 2 x4 a few feet longer than the concrete form, and lots of manpower.  Richard, Nick and Brian had the inglorious task of sawing that board back and forth thousands of times to level the concrete and bring up the cream.  Well Tony had been looking for a power screeder, which replaces the sawing motion of a 2x4 with a vibrating aluminum straight edge, for a couple and years, and finally procured one this spring.  It was perfect timing as Camp Daniel had received a grant to pour $6,000 worth of sidewalks around the dorms. (the grant required the money to be used by the first week of June).
 So Tony and the guys started making forms enabling us to pour in sections.  As each section was poured the landscaping around the concrete needed to be filled in with top soil, as the heavy equipment cannot drive on the new sidewalks.  Think of mopping yourself out of a room;  a little planning ahead goes a long way.  Well, the weeks go by and we are doing great.  We love the new machine and we all really feel like we kind of know what we're doing.
 Then it happens.  You cannot see the effect in the photo above, but just trust me.  In the darker  (wet) concrete in the photo above, we had a bit of an accident.  We had just finished and everyone scattered to work on other jobs, when Brian runs to find me saying that George got in the concrete.  Sure enough, many sets of dog prints are evident in the still soft concrete.  Well we all gathered and rushed to fix the damage before it could set any harder, but "Portland" must have been upset with us anyways.  So for the next pour he took out his anger at us by giving us a hot, windy sand storm to deal with.  And let me tell you, it wasn't fun, but the temperamental god was still not satisfied.
 So on the next pour, shown above, Portland really let us have it.  Working with gravity, this god laughed at us as we tried to pour on a hill, using our new fancy power screeder.  Let's just say that it didn't work.  It seems to just giggle the concrete right down the hill.  We ended up going old school with a 14' 2x4 and lots of sawing action to get the concrete level and not in a big pile at the bottom of the hill.  We figured out a technique that worked, and were able to pour a second sloped section later the same day.  So although we've poured 7 truckloads of concrete in the past month, we still have a few to go.  So if you believe in modern mythology, make a sacrifice to Portland, the god of concrete, that we may have good weather, good tools and good workers for the remainder of our concrete season!