Saturday was another work day at Camp Daniel. We were very appreciative to have 5 people come from the Three Lakes Area. The eight maple trees that were bought the other day were all planted in different locations around the grounds. The nature center was cleaned up and the paint was moved into there because that building will be heated for the winter. As you can see in the pic below, some of the guys were working on drywalling the ceilings in two of the dorm rooms. Soon we'll be able to blow insulation into the ceiling. This is crucial to allow work to continue in the dorms thru the winter.